Support for Faculty

 
The Centre for Teaching & Learning offers expert resources and skilled support for faculty developing, designing, and delivering excellent student learning. We provide topical and timely resources, training, educational technology, and guidance that foster a pedagogically-based, student-centered teaching.

 

Teaching & Learning

Empower students and transform learning through innovative, inclusive, and effective teaching.

Teaching & Learning Resources

Learning Technology

Leverage digital tools and strategies to create engaging, inclusive, and flexible learning experiences.

Technology Tools

Curriculum Development

Design meaningful, student-centered curricula that foster engagement, adaptability, and academic excellence.

Curriculum Support


Faculty Development

Grow your teaching practice through collaboration, innovation, and continuous learning.

Development Opportunities

Connect

Strengthen your teaching through expert support, collaboration, and practical resources. 

Connect With Us

CTL Events

Workshops, training sessions, communities of practice, and key academic events for faculty.

View Events

 

 

What's Happening at CNC

 

Building Envelope Project Update

    • Prince George
  • December 18, 2025
100725 Update-Image Web BE

Current Updates 

Stay informed with regular updates as construction progresses. We’ll keep you posted on project milestones, potential disruptions, and other important details.

Construction continues across the Prince George Campus with work in the 100, 300, and 700 Blocks.

Accessible parking near the Main Entrance has been relocated to the crosswalk ramp, and a detour is in place for those walking from the east side.

Check the full map to see how campus blocks are connected and where work is taking place.

Upcoming Activities

Week of December 15 - 21
100 Block
  • Excavation on the ground
  • Moisture shield and insulation installed
  • Interior window trim painting
  • Exterior metal framing and window flashing installation

300 Block

  • Courtyard side: pouring concrete near the exit doors for the foundations of the new exterior canopies
  • Rooftop mechanical work
  • Exterior metal framing, insulation, and window flashing installation

700 Block

  • Additional framing for lighting
  • 1st floor window replacement work is underway, spanning from the south side of the Main Entrance to the East Entrance
  • 2nd floor (Learning Commons) – preparing to install new windows for January 5th
  • Water shield installing exterior wall base
  • Exterior metal framing, insulation, and window flashing installation
  • South: Installation of wall paneling 
  • Roof installation (West side) – top of common area/atrium

December 22

700 Block

  • 2nd floor (Learning Commons) – preparing to install new windows for January 5th

No work anticipated between Dec 23rd – Jan 5th

Expected Impacts:

🔊 Noise: Elevated noise levels.

🚧 Access: Temporary alternate routes and partial entrance closures. Small detour at the west entrance during stair replacement.

🚫 Closures: Weight Room and second level of 500 Block closed until further notice. Bike rack at west entrance closed until end of October.

👷 Visibility: Ongoing construction activity and visual disruptions in affected areas.

Safety Reminder

  • Please follow all posted signage and detour instructions.
  • For your safety, do not enter active construction zones.

About the Project 

The Building Envelope Project is designed to enhance the exterior of the Prince George campus with energy-efficient upgrades, a modernized aesthetic, and a focus on long-term sustainability. These improvements will provide a more comfortable, energy-efficient space for everyone at CNC while maintaining our facilities’ resilience well into the future.

This project is made possible with restricted capital funding by the Ministry of Infrastructure. 

The Building Envelope Project aligns with CNC’s Strategic Plan (lhulh whuts’odutel’eh – Learning Together) under Priority 3.5: Rejuvenate College Infrastructure. Specifically, it supports objectives 3.5.1 through 3.5.4 by upgrading campus infrastructure, revitalizing learning spaces, improving sustainability, and helping reduce the college’s overall carbon footprint.

Key Highlights of the Project: 

  • Energy-efficient upgrades for better sustainability.
  • A modernized campus exterior to reflect our commitment to innovation.
  • Long-term durability to ensure the campus remains functional and eco-friendly for years to come.  

Project Timeline

  • March 2025: Pre-construction preparations and site setup begin.
  • April 11: Pre-construction phase
  • April 25: Transition to demolition stage.
  • May 2025: Official construction begins.
  • May 9, 2025: Demolition work on the 100 Block started
  • June 8, 2025: 100 Block demolition work largely complete. Demolition work on the 700 Block started.
  • June 15, 2025: Demolition work on the east and south side of the 700 Block continues.
  • July 2, 2025: Installation of initial building envelope components at the east and south side of the 700 Block started.
  • August 11, 2025: Roof work, brick façade and wall stucco removal on the 700 Block started
  • August 18, 2025: Penthouse demolition and landscaping work on the 700 Block started
  • September 4, 2025: Elevated walkway work on the 300 Block started
  • September 8, 2025: Window replacement work on the 100 Block started. Moisture shield barrier installation on 100 Block started.
  • October 14, 2025: Sidewalk and foundation removal at the west entrance of the 500 Block for stair replacement started.
  • October 20, 2025: 100 Block interior window trims work start. 700 Block brick façade almost done.
  • November 25, 2025: 500 block stairs installed. Weight room and 2nd floor open. Slight detour in West Entrance lifted
  • November 26, 2025: 700 block, 1st floor window replacement
  • Duration: Approximately 2 years 
  • Completion Date: May 2027 (estimated) 

Impact on Campus

We are committed to minimizing disruptions during construction. While work is taking place, we will keep staff, students and visitors informed about: 

  • Campus accessibility 
  • Potential disruptions 
  • Changes to parking and entrances 

Our team is focused on ensuring that the impact on your daily experience is as minimal as possible.