Current Updates
Stay informed with regular updates as construction progresses. We’ll keep you posted on project milestones, potential disruptions, and other important details.
Construction continues through November across the Prince George Campus. Focusing on roof installation, window replacement, and exterior improvements across multiple blocks. The main entrance is partially closed, and the east entrance is fully closed. Some exits on the 1st floor of the 300 Block, and the back of the Health and Wellness Center are closed until work is complete. The Weight Room will remain closed until further notice. Pedestrians should stay alert near construction areas.
Accessible parking near the Main Entrance has been relocated to the crosswalk ramp, and a detour is in place for those walking from the east side.
Check the full map to see how campus blocks are connected and where work is taking place.
Upcoming Activities
Week of November 17 - 23
700 Block:
- Roof installation
- Exterior insulation installation on first and second floors
- Exterior panel installation
- Additional framing for lighting
300 Block: Chipping existing concrete and performing new concrete work on the north side of the 300 block.
100 Block:
- Install interior window trim
- Ongoing moisture barrier shield installation, siding clip installation, and exterior insulation
Week of November 24 – December 7
100 Block:
- Continuing install of moisture barrier shield, exterior insulation, and siding clips.
- Painting of interior window trim. North and south side areas remain restricted.
700 Block:
- Roof installation
- First-floor window installation
- Exterior insulation installation on first and second floors
- Exterior panel installation
- Additional framing for lighting
Expected Impacts:
🔊 Noise: Elevated noise levels.
🚧 Access: Temporary alternate routes and partial entrance closures. Small detour at the west entrance during stair replacement.
🚫 Closures: Weight Room and second level of 500 Block closed until further notice. Bike rack at west entrance closed until end of October.
👷 Visibility: Ongoing construction activity and visual disruptions in affected areas.
Safety Reminder
- Please follow all posted signage and detour instructions.
- For your safety, do not enter active construction zones.
About the Project
The Building Envelope Project is designed to enhance the exterior of the Prince George campus with energy-efficient upgrades, a modernized aesthetic, and a focus on long-term sustainability. These improvements will provide a more comfortable, energy-efficient space for everyone at CNC while maintaining our facilities’ resilience well into the future.
This project is made possible with restricted capital funding by the Ministry of Infrastructure.
The Building Envelope Project aligns with CNC’s Strategic Plan (lhulh whuts’odutel’eh – Learning Together) under Priority 3.5: Rejuvenate College Infrastructure. Specifically, it supports objectives 3.5.1 through 3.5.4 by upgrading campus infrastructure, revitalizing learning spaces, improving sustainability, and helping reduce the college’s overall carbon footprint.
Key Highlights of the Project:
- Energy-efficient upgrades for better sustainability.
- A modernized campus exterior to reflect our commitment to innovation.
- Long-term durability to ensure the campus remains functional and eco-friendly for years to come.
Project Timeline
- March 2025: Pre-construction preparations and site setup begin.
- April 11:Pre-construction phase
- April 25:Transition to demolition stage.
- May 2025: Official construction begins.
- May 9, 2025: Demolition work on the 100 Block started
- June 8, 2025: 100 Block demolition work largely complete. Demolition work on the 700 Block started.
- June 15, 2025: Demolition work on the east and south side of the 700 Block continues.
- July 2, 2025: Installation of initial building envelope components at the east and south side of the 700 Block started.
- August 11, 2025: Roof work, brick façade and wall stucco removal on the 700 Block started
- August 18, 2025: Penthouse demolition and landscaping work on the 700 Block started
- September 4, 2025: Elevated walkway work on the 300 Block started
- September 8, 2025: Window replacement work on the 100 Block started. Moisture shield barrier installation on 100 Block started.
- October 14, 2025: Sidewalk and foundation removal at the west entrance of the 500 Block for stair replacement started.
- October 20, 2025: 100 Block interior window trims work start. 700 Block brick façade almost done.
- November 3, 2025: 700 Block window replacement starts.
- Duration: Approximately 2 years
- Completion Date: May 2027 (estimated)
Impact on Campus
We are committed to minimizing disruptions during construction. While work is taking place, we will keep staff, students and visitors informed about:
- Campus accessibility
- Potential disruptions
- Changes to parking and entrances
Our team is focused on ensuring that the impact on your daily experience is as minimal as possible.